Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Al Rashid Towers, Al Khobar
November 13, 2022
Storm Water Network Project at East Nasim and West Muaziliyyah District, Riyadh
November 13, 2022

Al Rahji Deerab Road Riyadh Project

LOCATION

Riyadh

OWNER

National Water Company (NWC)

CLIENT
Al Rajhi for Infrastructure Works Co. 
SCOPE OF WORK

Full thrust boring solution / Carrier Pipe Installation

MACHINE

Full Face

CASING PIPE OD

2100 mm

CARRIER PIPE OD

1828.8 mm

ACTUAL LENGTH

110 m

Al1
Al2
Al3
Al4
Al5
Al6
Al7
Al8
Previous
Next
Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022