Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Implementation of Stormwater Drainage Network (North of Riyadh)
November 27, 2022
Khobar-Hofuf Water Transmission System Phase 2
November 28, 2022

Stormwater Drainage Network for Malqa – Hittin District

LOCATION

Riyadh

OWNER

Riyadh Municipality

CLIENT

Yuksel Insaat Saudia Co. Ltd.

SCOPE OF WORK

Full thrust boring solution
External Grouting

MACHINE 
AVN1400
CASING PIPE OD

 1700 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

473 m

Hi1
hi3
hi4
hi5
hi6
hi7
hi8
hi9
hi10
hi12
Previous
Next
Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022