Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Stormwater Drainage Network for Malqa – Hittin District
November 27, 2022
Yanbu 4 Independent Water Project
February 2, 2023

Khobar-Hofuf Water Transmission System Phase 2

LOCATION

Al Khobar / Al Hofuf / Al Hasa

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT

Mutlaq Al-Ghowairi Contracting Company (MGC)

SCOPE OF WORK

Full thrust boring / Carrier Pipe Installation / External & Internal Grouting

MACNINE
Full Face / Road Header AVN2600
CASING PIPE OD

  3100 / 2438.4mm

CARRIER PIPE OD
2032mm
LENGTH

On Going

Kh2
Kh3
Kh5
Kh7
Kh8
Kh9
kh14
kh10
KH12
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022