Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Stormwater Drainage Network for Malqa – Hittin District
November 27, 2022
Yanbu 4 Independent Water Project
February 2, 2023

Khobar-Hofuf Water Transmission System Phase 2

LOCATION

Al Khobar
Al Hofuf
Al Hasa

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT

Mutlaq Al-Ghowairi Contracting Company (MGC)

SCOPE OF WORK

Full thrust boring
Carrier Pipe Installation
External & Internal Grouting

MACNINE
Full Face
Road Header
AVN2600
CASING PIPE OD

  3100 mm
2438.4mm

CARRIER PIPE OD
2032mm
ACTUAL LENGTH

1223

Kh2
Kh3
Kh5
Kh7
Kh8
Kh9
kh14
kh10
KH12
Previous
Next
Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)