Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Ras Al Khair – Riyadh Transmission System (Package – B2)
February 6, 2023
Jeddah Storm Water Drainage Project – Airport Outfall
February 6, 2023

Downstream Gas Pipeline Hawiyah Trenchless Crossing

LOCATION

Jubail

OWNER

Saudi Aramco

CLIENT

Al-Rashid Trading and Contracting Company (RTCC)

SCOPE OF WORK

Full thrust boring / Carrier Pipe Installation

MACHINE 
AVN1400
CASING PIPE OD 
1727.2mm
CARRIER PIPE OD

 1422.4mm

LENGTH

On Going

D2
D1
D3
D5
D6
D7
D8
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022