    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Jeddah Storm Water Drainage Project – Airport Outfall
February 6, 2023
Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3

LOCATION

Jubail / Dharan

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT
Al-Rashid Trading and Contracting Company (RTCC)
SCOPE OF WORK
Full thrust boring / Carrier Pipe Installation / External & Internal Grouting
MACHINE 
AVN2600 / AVN1400 / AVN1200 / Road Header / Full Face
CASING PIPE OD

 3100 / 2438.4 / 1720 / 1490mm

CARRIER PIPE OD

2540 / 2032 / 1321 / 558.8mm

LENGTH
On Going
Jep2
Jep3
Jep8
Jep6
Jep13
Jep11
Jep15
Jep16
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jeddah Storm Water Drainage Project – Airport Outfall


View more