Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Shuqaiq 3 – Water Transmission System B2 & C
March 8, 2023
Design & Build of SWCC Pipeline Diversion
March 9, 2023

King Khaled Military City Feeder Water Transmission System

LOCATION

Hafr Al Batin

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT
Mutlaq Al-Ghowairi Contracting Company (MGC)
SCOPE OF WORK
   Hydrostatic Testing Works
MACHINE 
Medium Pressure Pump
CARRIER PIPE OD

88″

chronometer
TEST PRESSURE

 27 Bar at High Point

LENGTH

81.7 Kilometers

K1
k2
k3
k6
k7
k8
Previous
Next
Share

Other Projects

March 9, 2023

Jubail-Riyadh Water Transmission System


View more
March 9, 2023

Tofeih-Jubail Water Transmission System


View more
March 9, 2023

New Abha Metropolitan City Feeder 1 & 2


View more
March 9, 2023

Design & Build of SWCC Pipeline Diversion


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022