Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
TSE Network for Green Riyadh Program – Group 12 (DN2200 / DN2000)
December 22, 2025
Construction of Abhour 380/110/13.8 kV BSP (DN3500 / DN2600)
December 22, 2025

Jeddah Storm Water and MasterPlan (JSWM) Drainage Solution for Abruq-Ar-Rughama Area (DN3500)

LOCATION

Jeddah

OWNER

Jeddah Municipality

CLIENT
Shibh Al Jazira Contracting Co.
SCOPE OF WORK
Thrust Boring,
Casing Pipe Installation,
External Grouting
MACHINE 
AVN3500
CASING PIPE OD

4200 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

384.78 mm

WEBSITE POST
WEBSITE POST (1)
WEBSITE POST (2)
WEBSITE POST (3)
Previous
Next

Jeddah Storm Water and MasterPlan (JSWM) Drainage Solution for Abruq-Ar-Rughama Area

1 Videos

Jeddah Storm Water and MasterPlan (JSWM) Drainage Solution for Abruq-Ar-Rughama Area

Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022