Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Rayis Rabigh IWTP2 (DN3000)
December 22, 2025
TSE Network for Green Riyadh Program – Group 10 (DN2000)
December 22, 2025

Arada Water Transmission System Phase-2 Project (DN1200)

LOCATION

Al Baha

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT
ESNAD Al-Turuq for General Contracting
SCOPE OF WORK
Thrust Boring,
Casing Pipe Installation,
Grouting,
Carrier Pipe Installation
MACHINE 
AVN1200
CASING PIPE OD

1200 mm
1500 mm

CARRIER PIPE OD

24″
40″
48″

LENGTH

On Going

WEBSITE POST (1)
WEBSITE POST (2)
WEBSITE POST (3)
WEBSITE POST (4)
WEBSITE POST (5)
WEBSITE POST (6)
Previous
Next
Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022