Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Sewage Capacity Network In Mina Group 1 (DN3500)
December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)

LOCATION

Buraidah

OWNER

Buraidah Municipality

CLIENT
Saudi Services for Electro Mechanic Works (SSEM)
SCOPE OF WORK
Thrust Boring ,
Casing Pipe Installation,
External Grouting
MACHINE 
AVN3000 / AVN3500
CASING PIPE OD

4200mm / 3600mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

4,089 M

Photo 1 copy
Photo 2
Photo 3
Photo 9
Photo 8
Photo 6
Photo 4
Photo 10
Photo 11
Photo 12
Previous
Next
Share

Other Projects

December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more
December 23, 2025

Treatment of Storm Water Accumulated Areas at Movable Axis & Critical Points in Riyadh (DN2000)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022