HOME
ABOUT US
SERVICES
Tunneling / Microtunneling
Industrial Services
EQUIPMENT
Tunneling / Microtunneling
AVN3500
AVN3000 / 3500
AVN2200 / 2600 / 3000
ROAD HEADER 2880 / 3000 / 3100 / 3600
ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
TBM1800TE (FULL FACE) / 2000 / 2400
AVN1200 – AVN1400
EX1200
Industrial Services
Filling Pump – 1500 m3/hr – H:120m
Multistage Pump 120 m3/hr – 40 Bar
Plunger Pump – 100 l/min – 400 Bar
Plunger Pump – 15 l/min – 160 Bar
PROJECTS
Tunneling / Microtunneling Projects
Industrial Services Projects
OUR CLIENTS
CONTACT US
✕
Sewage Capacity Network In Mina Group 1 (DN3500)
December 23, 2025
Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)
LOCATION
Buraidah
OWNER
Buraidah Municipality
CLIENT
Saudi Services for Electro Mechanic Works (SSEM)
SCOPE OF WORK
Thrust Boring ,
Casing Pipe Installation,
External Grouting
MACHINE
AVN3000 / AVN3500
CASING PIPE OD
4200mm / 3600mm
CARRIER PIPE OD
N/A
ACTUAL LENGTH
4,089 M
Previous
Next
Share
Other Projects
December 23, 2025
Sewage Capacity Network In Mina Group 1 (DN3500)
View more
December 23, 2025
Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)
View more
December 23, 2025
Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)
View more
December 23, 2025
Treatment of Storm Water Accumulated Areas at Movable Axis & Critical Points in Riyadh (DN2000)
View more