Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing
February 6, 2023
Buraidah Stormwater From Al-Naqae to Al-Wadi
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03

LOCATION

Jeddah

OWNER

Jeddah Municipality

CLIENT

Saudi Services for Electro Mechanic Works (SSEM)

SCOPE OF WORK

Full thrust boring solution / External Grouting

MACHINE 
 AVN3500 / AVN3000 / AVN2000
CASING PIPE OD

 4200 / 3600 / 2400 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

2626 m

SSEMJ001
SSEMJ01
SSEMJ1
SSEMJ2
SSEMJ3
SSEMJ4
SSEMJ5
SSEMJ6
SSEMJ7
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more
February 6, 2023

Jeddah Storm Water Drainage Project – Airport Outfall


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022