Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Design & Build of SWCC Pipeline Diversion
March 9, 2023
Tofeih-Jubail Water Transmission System
March 9, 2023

New Abha Metropolitan City Feeder 1 & 2

LOCATION

Abha

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT
Mutlaq Al-Ghowairi Contracting Company (MGC)
SCOPE OF WORK
   Hydrostatic Testing Works
MACHINE 
High Pressure Pump 
CARRIER PIPE OD

56″ / 36″ / 24″ / 20″

chronometer
TEST PRESSURE

10 to 45 Bar at High Point

LENGTH

52.9 Kilometers

ShuAbha1
shuabha2
shuabha3
Shuabha4
Previous
Next
Share

Other Projects

March 9, 2023

Jubail-Riyadh Water Transmission System


View more
March 9, 2023

Tofeih-Jubail Water Transmission System


View more
March 9, 2023

Design & Build of SWCC Pipeline Diversion


View more
March 9, 2023

King Khaled Military City Feeder Water Transmission System


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022