HOME
ABOUT US
SERVICES
Tunneling / Microtunneling
Industrial Services
EQUIPMENT
Tunneling / Microtunneling
AVN3500
AVN3000 / 3500
AVN2200 / 2600 / 3000
ROAD HEADER 2880 / 3000 / 3100 / 3600
ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
TBM1800TE (FULL FACE) / 2000 / 2400
AVN1200 – AVN1400
EX1200
Industrial Services
Filling Pump – 1500 m3/hr – H:120m
Multistage Pump 120 m3/hr – 40 Bar
Plunger Pump – 100 l/min – 400 Bar
Plunger Pump – 15 l/min – 160 Bar
PROJECTS
Tunneling / Microtunneling Projects
Industrial Services Projects
OUR CLIENTS
CONTACT US
✕
TSE Network for Green Riyadh Program – Group 1 (DN3000)
December 11, 2025
Rayis Rabigh IWTP2 (DN3000)
December 22, 2025
Ras Al Khair-Riyadh Water Transmission System (Package B1) (DN2600)
LOCATION
Al Khair
OWNER
Saline Water Conversion Corporation (SWCC)
CLIENT
ESNAD Al-Turuq for General Contracting
SCOPE OF WORK
Thrust Boring,
Casing Pipe Installation,
Grouting,
Carrier Pipe Installation
MACHINE
AVN2600
Road Header 02
CASING PIPE OD
2600 mm
CARRIER PIPE OD
88″
LENGTH
On Going
Previous
Next
Share
Other Projects
December 23, 2025
Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)
View more
December 23, 2025
Sewage Capacity Network In Mina Group 1 (DN3500)
View more
December 23, 2025
Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)
View more
December 23, 2025
Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)
View more