Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Mughammas Strategic Reservior Water Transmission System
February 6, 2023
Jubail Riyadh Water Transmission System Phase 3
February 6, 2023

Shuqaiq 3 – Water Transmission System B2 & C

LOCATION

Shuqaiq & Abha

OWNER

Saline Water Conversion Corporation (SWCC)

CLIENT

Al-Rashid Trading and Contracting Company (RTCC)

SCOPE OF WORK

Full thrust boring / Carrier Pipe Installation / External & Internal Grouting

MACHINE 
Road Header / Full Face / AVN1400
CASING PIPE OD

  3100 / 2438.4 / 1720mm

CARRIER PIPE OD

2032 / 1321 / 1220mm

ACTUAL LENGTH

1283 m

sh5
sh7
sh4
sh3
sh15
sh14
sh13
sh12
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022