Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Implementation of Stormwater Drainage Network (North of Riyadh)
November 27, 2022
Khobar-Hofuf Water Transmission System Phase 2
November 28, 2022

Stormwater Drainage Network for Malqa – Hittin District

LOCATION

Riyadh

OWNER

Riyadh Municipality

CLIENT

Yuksel Saudia

SCOPE OF WORK

Full thrust boring solution / External Grouting

MACHINE 
AVN1400
CASING PIPE OD

 1700 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

473 m

Hi1
hi3
hi4
hi5
hi6
hi7
hi8
hi9
hi10
hi12
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022