Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Yanbu 4 Independent Water Project
February 2, 2023
Mughammas Strategic Reservior Water Transmission System
February 6, 2023

Stormwater Network Project at Mansourah & Faisaliyah District of Riyadh

LOCATION

Riyadh

OWNER

Riyadh Municipality

CLIENT

Mutlaq Al-Ghowairi Contracting Co. (MGC)

SCOPE OF WORK

Full thrust boring solution

MACHINE 
Road Header / Full Face
CASING PIPE OD

 2422 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

1659 m

MGC Mansourah2
MGC Mansourah3
MGC Mansourah4
MGC Mansourah5
MGC Mansourah1
MGC Mansourah6
MGC Mansourah7
MGC Mansourah08
MGC Mansourah8
MGC Mansourah9
Previous
Next
Share

Other Projects

February 6, 2023

Buraidah Stormwater From Al-Naqae to Al-Wadi


View more
February 6, 2023

Jeddah Storm Water and MasterPlan (JSWM) UP03


View more
February 6, 2023

Wadi As Sulay Storm Water Drainage – 3600mm Pipeline Railway Crossing


View more
February 6, 2023

Jubail to Eastern Povince Water Transmission System Phase 3


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022