Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)
December 23, 2025
Sewage Capacity Network In Mina Group 1 (DN3500)
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)

LOCATION

Makkah

OWNER

National Water Company

CLIENT
Bin Omairah Contracting Co.
SCOPE OF WORK
Thrust Boring,
Casing Pipe Installation,
Grouting,
Carrier Pipe Installation
MACHINE 
AVN3000
CASING PIPE OD

3000 mm

CARRIER PIPE OD

2500 mm

LENGTH

On Going

WEBSITE POST (1)
WEBSITE POST (2)
WEBSITE POST (3)
WEBSITE POST
Previous
Next

Third Ring Road Supply Project

2 Videos

The Longest Hard Rock Tunnel in KSA & the Middle East, with length of 701m

Inside The Tunnel

Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more
December 23, 2025

Treatment of Storm Water Accumulated Areas at Movable Axis & Critical Points in Riyadh (DN2000)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022