Asset 1Asset 1Asset 1Asset 1
  • HOME
  • ABOUT US
  • SERVICES
    • Tunneling / Microtunneling
    • Industrial Services
  • EQUIPMENT
    • Tunneling / Microtunneling
      • AVN3500
      • AVN3000 / 3500
      • AVN2200 / 2600 / 3000
      • ROAD HEADER 2880 / 3000 / 3100 / 3600
      • ROAD HEADER 2000 / 2400 / 2880 / 3000 / 3100
      • TBM1800TE (FULL FACE) / 2000 / 2400
      • AVN1200 – AVN1400
      • EX1200
    • Industrial Services
      • Filling Pump – 1500 m3/hr – H:120m
      • Multistage Pump 120 m3/hr – 40 Bar
      • Plunger Pump – 100 l/min – 400 Bar
      • Plunger Pump – 15 l/min – 160 Bar
  • PROJECTS
    • Tunneling / Microtunneling Projects
    • Industrial Services Projects
  • OUR CLIENTS
  • CONTACT US
✕
Wadi As Sulai Project Dammam Road Crossing (DN3000)
December 23, 2025
Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)
December 23, 2025

Treatment of Storm Water Accumulated Areas at Movable Axis & Critical Points in Riyadh (DN2000)

LOCATION

Riyadh

OWNER

Riyadh Municipality

CLIENT
Yuksel Insaat Saudia Co. Ltd.
SCOPE OF WORK
Thrust Boring,
Casing Pipe Installation,
External Grouting
MACHINE 
Full Face
Road Header 01
CASING PIPE OD

2400 mm

CARRIER PIPE OD

N/A

ACTUAL LENGTH

412.12 m

WEBSITE POST (5)
WEBSITE POST (2)
WEBSITE POST (3)
WEBSITE POST (4)
WEBSITE POST (1)
WEBSITE POST (6)
WEBSITE POST
Previous
Next
Share

Other Projects

December 23, 2025

Buraidah Stormwater From Al-Naqae to Al-Wadi (DN3500 / DN3000)


View more
December 23, 2025

Sewage Capacity Network In Mina Group 1 (DN3500)


View more
December 23, 2025

Third Ring Road Water Transmission Project – Al Adil-Makkah (DN3000)


View more
December 23, 2025

Execution of Storm Water Drainage Network in (Al Yasmin-Al Ared Qayrawan) Districts in North Riyadh (DN1400)


View more

All rights received 2022

  • Facebook
  • Instagram
  • Twitter
All rights received 2022